LEI Oregon has provided land surveying, civil engineering design, permitting, and construction-phase engineering services for the multi-phase expansion of the Marion Resource Recovery Facility in Brooks, Oregon. The project began with the development of a materials processing facility encompassing more than 64,000 square feet of buildings and supporting improvements on a 16-acre industrial site. Since the initial development, LEI Oregon has continued to support facility improvements, stormwater system upgrades, and permitting requirements as the site’s operational needs have evolved.
The initial development included site grading, parking facilities, utility infrastructure, and frontage improvements along Brooklake Road. LEI Oregon designed an innovative stormwater treatment and conveyance system utilizing SmartDitch, which directs runoff through bioswales for enhanced water quality treatment. The system was developed to address site constraints while exceeding standard treatment requirements.
Subsequent phases have included additional site improvements, stormwater infrastructure upgrades, and environmental permitting and compliance services. LEI Oregon designed improvements to accommodate approximately 27,000 square feet of additional impervious surface, along with modifications to existing stormwater facilities. Additional improvements included a rain garden for water quality treatment, expanded detention capacity, upgraded pollution control structures, and a stormwater pump station to convey treated runoff to the roadside drainage system.
LEI Oregon has also provided environmental permitting and regulatory compliance services, including ongoing support for the facility’s DEQ 1200-Z industrial stormwater permit. These services have involved coordination with the Oregon Department of Environmental Quality (DEQ), stormwater monitoring, and engineering support to address evolving regulatory requirements. LEI Oregon has also assisted with permitting and coordination for additional facility improvements, working closely with Marion County and DEQ to support the facility’s continued operation and expansion.






